CHARLESTON, Ill. – Busy traffic, a steady flow of visitors and unique materials were among the challenges Western Specialty Contractors’ Springfield, Ill., branch faced when it restored the stone façade of a local historic public building.
Located in the public square in central Charleston, the Coles County Courthouse was added to the National Register of Historic Places in 1978. Built in 1898 and designed by architect Cornelius W. Rapp in the Richardsonian Romanesque style, the Coles County Courthouse features a clock tower at its center, four main entrances and a facade constructed of brownstone from the Embarras River.
Still in active service, the building houses most of Coles County’s important administrative offices and courts.
Western Specialty Contractors was contracted to restore the building’s stone facade, including its four corner pavilions – each over 40’ tall. The architect on the restoration project was Hance Design Group of Mattoon, Ill.
The first challenge Western crews faced on the project was removal and replacement of the large, heavy stone pieces near the top of the pavilions. Western worked with the architect to prepare shop drawings to show coursing that would allow crews to use more manageable sized stones as replacements, rather than utilizing the large, original stone pieces. This technique allowed Western to move the stone to the top of the building using a man lift rather than a crane, which would have required that traffic be blocked off around the busy courthouse.
Western also made a conscious decision to use two 85’ lifts, rather than a single 45’ lift, to access the facade. The two, longer lifts could be placed in parking spaces along the perimeter of the street to reach the work areas, going up and over an underground holding area beneath the courthouse lawn, which posed a risk of collapse if equipment were placed on it.
“Continuing occupation of the courthouse and limiting disruption to the building’s vital daily activities was a top priority on the project,” said Scott Haas, Springfield branch manager.
When it came to color-matching for the stone patching, Western faced another challenge, as exact matching would be difficult due to the variation of coloring throughout the stone. In order to achieve a close match, Western crews created nine separate color mockups, assisted by Cathedral Stone (which supplied the stone material for the mockups). Where new stones were needed, Western crews were able to find replacement stones that closely matched the originals.
A final challenge on the project involved the mortar joints, which were not able to be removed to the correct depth with a standard grinder due to the stone face protruding past the mortar joint. Western found a solution by removing as much of the mortar as possible with a grinder, then chiseling out the remaining mortar by hand to achieve the proper depth.
In total, Western crews performed more than 25,000 lineal feet of tuckpointing; removed and replaced nearly 200 stones from the corner pavilions using four different sizes of stone; performed 150 ft² of stone patching at various depths; and cleaned 20,000 ft²of stone facade.
Western crews completed 75% of the tuckpointing work last fall, then completed the balance of the work this spring.